Connection of the sewage system – the rules

Sewer connection takes place on the basis of the provisions on discharge of wastewater. These regulations impose on undertakings water – sewage obligation connects the building to the sewer if you have met the standards laid down rules.

Trying to join the sewage system at its own expense, we must reckon with the obligation to provide the connection. In other words, it is the person who throws a desire to join the pregnancy costs of installation.